2. Completion of Work On Time.
3. Quality Assured.
4. Within Budget.
Vasthu Floor Plans, Working Drawings & 3D Elevation.
a) Isolated Footing
b) Earth Work Excavation - 4'-6" x 4'-6" x 5'-0" Depth (dewatering charges are included)
c) PCC For Footing - PCC 1:4:8, Size 4'-0" x 4'-0" x 4"
d) RCC For Footing - RCC 1:2:4, Size 4'-0" x 4'-0" x 12"
e) Plinth Beam - RCC 1:2:4, Size 9" x 12"
a) Basement Height - Basement Height 3' from the Natural Ground level (if you want increase height charges will be extra)
b) Tie Beam - RCC 1:2:4, Size 9" x 6" (Basement Top Level)
c) Pest Control - Anti Termite Treatment (Before PCC Flooring Work)
d) PCC For Flooring - PCC 1:4:8, 4" Thick
a) Brick Work - Brick Work in CM 1:5 & 1:6
b) Brick Work Thickness - 4.5" & 9" (As Per Floor Plan Drawing)
c) Room Height - 10'-0" (Floor Level to Roof Bottom)
d) Lintel Beam - RCC 1:2:4, Continuous Lintel 6" thick
e) Sunshade - RCC 1:2:4, 2' wide with smooth finishing
f) Loft - RCC 1:2:4, 2' wide with smooth finishing - Bed Room, Kitchen & Store Room Only and also each room loft one direction only (if you want Add'l loft charges will be extra)
g) Cupboard - Size 4' x 7' (Hall, Bed Room & Kitchen Only)
h) Roof Beam - RCC 1:2:4, Size 9" x 12"
j) Roof Slab - RCC 1:2:4, 4.5" Thick
k) Grill Work - Grill work window opening only, using plain type flat rods - 10mm Square Rod (if you want any design work for grill charges will be extra)
l) Plastering - Outer Platering in CM 1:5 rough finishes, Inner Platering in CM 1:5 smooth finishes, Ceilling Platering in CM 1:3 smooth finishes
m) Kitchen meda using granite slab (Granite Cost Rs.130 to 150 /s.ft) & Wall Tiles 4' Height From Kitchen meda
n) Toilets - All toilets will have one WC & Toilet wall fixing plain colour ceramic tiles upto door level
a) All flooring will be finished with vitrify (or) ceramic tiles
b) Flooring Tiles - Size 2' x 2' - Cost Rs 50 /s.ft
c) Car Parking, Two Wheeler Parking, Staircase & Passage Tiles : Cost Rs 35 /s.ft
d) Kitchen meda wall Tiles : Cost Rs 35 /s.ft
e) Toilet wall & Floor Tiles : Cost Rs 35 /s.ft
a) Brick Work - Brick Work in CM 1:6 & 4.5" Thick
b) Brick Work Height - 3'-0" Height From Open Terrace (If you want increase height charges will be extra)
a) Waist Slab - RCC 1:2:4, 4.5" Thick
b) Steps - Brick Work in CM 1:5, Tread 10" & Riser 6"
c) Handrails - Normal Steel Handrails (If you want SS Handrails extra amount will be charged)
a) Brick Work - Brick Work in CM 1:6 & Wall Thickness As Per Floor Plan Drawing
b) Room Height - 7'-0" Height From Open Terrace
a) Door & Window Size and Location - As Per Floor Plan Drawing
b) Window Glass - Normal Window Glass Cost Rs 40 / S.ft (If you want Design Glass extra amount will be charged)
c) Main Doors - 1st class ghana teak wood 3'-3" x 7'-0", frame 5"x 3", Shutter 1.5" thick
d) Other Doors - 2nd class ghana teak wood 3'-0" x 7'-0", frame 4"x 2.5" & flush shutter (Shutter Cost Rs. 2500 to 3000)
e) Windows - 2nd class ghana teak wooden frames 4" X 2.5" with glazed shutter full size
f) Ventilator - 2' X 1'-6" teak wood louvers type
g) PVC Sintex door using toilet, door size 2-6" X 7'-0" (Cost Rs. 1500 to 2000)
h) Hinges - Main Door - Brass Hinges, Other Door - Steel Hinges & Window - Powder Coated Hinges
(j) All Door - One Lock Only Provided (If you want any additional extra locks amount will be charged)
a) Fully Concealed type of electrification with necessary points
b) ISI mark 7/20, 3/20 & 1/18 wire and ISI brand switches provided
c) All Switches - Anchor - Roma (or) Equal Quality
d) All Cables - Orbit / Kundan (or) Equal Quality
AC - 4.0 SQ
Mixie & Grinder - 2.5 SQ
Others - 1.0 SQ
a) Water Closets - Parryware (Normal Western WC - Cost Rs.3000 - 4000 & Indian WC Cost Rs.2000 - 2500)
b) Kitchen Sink - Cost Rs.1200 - 1800
c) Wash Basin - Cost Rs.700 to 1000 - Toilets Only (If you want Additional wash basin charges will be extra)
d) Fittings - Waterman (or) Metro (or) Equal Quality
e) Wall Mixer : 2 In 1
f) Pipe Lines - Building inside - Concealed work & UPVC Pipes & Building outside - Open pipe line work & PVC Star Brand Pipes (or) Equal Quality
a) Company - Asian Paints
b) Building Inside Walls, Lofts & Cupboard will be finished 2 coats of cement paint (With putty work) and over 2 primer colour coats (Tractor Emulsion)
c) Building Outside Works will be finished 2 coats of cement paint and over 2 primer colour coats (ACE)
d) Ceilling will be finished 2 coats of cement paint (No putty work)
e) All Doors & Windows will be finished with enamel paint 2 coats
f) Main door only varnishing
Concrete Work - Grade 'A' Cement
Other Works - Grade 'B' Cement
ISI TMT Bars - 2nd Grade - Made From Scrap
All Reinforcement are used according to the structural design
Advance Before Starting of Work 20%
After The Completion of Basement 10%
After The Completion of Lintel 15%
After The Completion of Roof 25%
After The Completion of Plastering work 15%
After The Completion of Flooring Work 12%
Before Handing Over 3%
Advance Before Starting of Work 20%
After The Completion of Lintel 25%
After The Completion of Roof 25%
After The Completion of Plastering work 15%
After The Completion of Flooring Work 12%
Before Handing Over 3%
Cement (Grade A) Rs. 400 to 420 / Bag
Cement (Grade B) Rs. 350 to 370 / Bag
Steel (Grade B) Rs. 50 to 55 / Kg
Bricks Rs. 8.00 to 9.00 / No
M.Sand Rs. 45 to 50 / C.Ft
20 mm Jelly Rs. 30 to 35 / C.Ft
40 mm Jelly Rs. 30 to 35 / C.Ft
Mason Rs. 900 to 1000 / Head
MC Rs. 700 to 800 / Head
FC Rs. 600 to 700 / Head
Stone Cutter Rs. 900 to 1000 / Head
Carpenter & Barbender Rs. 900 to 1000 / Head